Prefabex Syria designed, manufactured, and delivered a modular dining hall building consisting of four interconnected 3 × 7 m containers for Hadid Metal Industries Factory, providing a dedicated dining facility for factory employees.
With an area of 21 m² per module and a combined building area of 84 m², the four modular units were connected to create a spacious and functional dining hall suitable for daily use by factory workers.
The building's internal layout was designed according to the client's specific requirements, with particular attention to efficient space utilization, practical circulation, and the operational needs of an industrial workforce.
The scope of work also included complete electrical installations, carried out according to the required technical specifications to support the building's daily operations.
All four modules were manufactured at the Prefabex Syria factory in Adra Industrial City and assembled into an integrated modular building, which was delivered fully equipped and ready for immediate use.
This project demonstrates Prefabex Syria's capability to manufacture multi-module prefabricated buildings for industrial facilities, including staff dining halls, worker welfare facilities, administrative buildings, and other customized modular structures.